Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Released version 1.20.

Description

...

Administering the Adhoc-Workflow

Download the example model at the bottom of this page. To import the model into yuuvis RAD designer, follow these steps:

  1. Copy the downloaded .bpmdef file into your yuuvis RAD designer project directory and open the designer.
  2. Create a model with same namespace and name of the model (namespace: "adhoc", name: "AdHoc-Workflow-x" where x is the version number) you just downloaded and moved into your project directory.

...

adhoc.AdHoc-Workflow-v1-19.bpmdef150
VersionDate

Compatible

core-service

version

AuthorDescriptionDownload
1.2005th May 20249.8 or newerA-Team
  • Fixed bug that the deadline period was only started for the first AdHoc task
  • Fixed a script error occurring if a task was not personalized before the configured deadline ends
  • Changed type of field deadline to Datetime to also allow the time to be set
  • Set property dueTime of activity in addition to deadline period


View file
nameadhoc.AdHoc-Workflow-v1-20.bpmdef
height150
1.1917th Aug 20239.8 or newerA-Team
  • Simplified localized text content defined in the script codes by using Boilerplate texts
  • Refactored script codes and data field names
  • Field 'initiator' is set automatically in BeforeStartActivitiy script of main activity
View file
name
height150

1.1826th Apr 2023up to 9.7A-Team
  • Monitoring of process can be activated on the start form
  • Monitoring inbox item shows the current routing list state with "Done" 'true' for created, personalized and forwarded inbox items
  • The first work item is assigned to process creator (instead of the example users "bartonitz" and "widiker" that were previously used by default for the first two sample tasks)
View file
nameadhoc.AdHoc-Workflow-v1-18.bpmdef
height

1.166th Sep 2021
Martin Bartonitz / Lars Nock
  • Model parameters set to only 'input', and removed routinglist_2

1.154th Jan 2020
Martin Bartonitz
  • Model can be used with and without an object (bug fixed for use with an object)
    • Adoptions for yuuvis RAD Version 6.0, but can be used in Versions 4 and 5 as well.

1.1221st June 2018
Martin Bartonitz
  • adapted for use with client 4.0

1.1022nd Nov 2017
Martin Bartonitz
  • Bugfix: Problem with finish last task
  • Setting more events to be historitized
  • optimizes process subject
  • javascript conformed technical names

1.916th Sep 2017
Martin Bartonitz
  • A process deadline is configured which finishes the corresponding task. The deadline ist set via API and uses the deadlines which the users set in the routing list.
  • needs release 3.23.2 2017-09-11 or earlier

1.84th Sep 2017
Martin Bartonitz
  • Some namings corrected
  • Routing list is sorted after change now
  • Can be started without object
  • needs release 3.20.x 2017-08-30 or earlier

1.52nd Aug 2017
Martin Bartonitz
  • The name 'period' changed to 'deadline' because this is the standard name for this purpose.
  • Small look & feel changes for the whatabout field and the routinglist in the start form.

1.525th Jul 2017
Martin Bartonitz

Internationalization:

  • Preset text for 'What about' and 'Comment'
  • If 'What about' and 'Comment' are empty, some corresponding text
  • Timestamp within 'What about'
  • Some error cases handled in a better way

1.420th Jul 2017
Martin Bartonitz

Start with basics:

  1. Fill routing list during process start
  2. Optional monitoring and controlling task allows changes by the process initiator
  3. Sequential processing of the routing list with only one editor per task. If allowed by the process initiator, the current editor can change the rest tasks of the routing list
  4. Protocol of the processing comments.

...