Description
...
Administering the Adhoc-Workflow
Download the example model at the bottom of this page. To import the model into yuuvis RAD designer, follow these steps:
- Copy the downloaded .bpmdef file into your yuuvis RAD designer project directory and open the designer.
- Create a model with same namespace and name of the model (namespace: "adhoc", name: "AdHoc-Workflow-x" where x is the version number) you just downloaded and moved into your project directory.
...
Version | Date | Compatible core-service version | Author | Description | Download |
---|
2.0 | 13th May 2024 | 10.4 or newer | A-Team | Refactored script codes to replace deprecated methods | View file |
---|
name | adhoc.AdHoc-Workflow-v2-0.bpmdef |
---|
height | 150 |
---|
|
|
1.20 | 05th May 2024 | 9.8 or newer | A-Team | - Fixed bug that the deadline period was only started for the first AdHoc task
- Fixed a script error occurring if a task was not personalized before the configured deadline ends
- Changed type of field deadline to Datetime to also allow the time to be set
- Set property dueTime of activity in addition to deadline period
| View file |
---|
name | adhoc.AdHoc-Workflow-v1-20.bpmdef |
---|
height | 150 |
---|
|
|
1.19 | 17th Aug 2023 | 9.8 or newer | A-Team | - Simplified localized text content defined in the script codes by using Boilerplate texts
- Refactored script codes and data field names
- Field 'initiator' is set automatically in BeforeStartActivitiy script of main activity
|
|
1.18 | 26th Apr 2023 | up to 9.7 | A-Team | - Monitoring of process can be activated on the start form
- Monitoring inbox item shows the current routing list state with "Done" 'true' for created, personalized and forwarded inbox items
- The first work item is assigned to process creator (instead of the example users "bartonitz" and "widiker" that were previously used by default for the first two sample tasks)
|
|
1.16 | 6th Sep 2021 |
| Martin Bartonitz / Lars Nock | - Model parameters set to only 'input', and removed routinglist_2
|
|
1.15 | 4th Jan 2020 |
| Martin Bartonitz | - Model can be used with and without an object (bug fixed for use with an object)
- Adoptions for yuuvis RAD Version 6.0, but can be used in Versions 4 and 5 as well.
|
|
1.12 | 21st June 2018 |
| Martin Bartonitz | - adapted for use with client 4.0
|
|
1.10 | 22nd Nov 2017 |
| Martin Bartonitz | - Bugfix: Problem with finish last task
- Setting more events to be historitized
- optimizes process subject
- javascript conformed technical names
|
|
1.9 | 16th Sep 2017 |
| Martin Bartonitz | - A process deadline is configured which finishes the corresponding task. The deadline ist set via API and uses the deadlines which the users set in the routing list.
- needs release 3.23.2 2017-09-11 or earlier
|
|
1.8 | 4th Sep 2017 |
| Martin Bartonitz | - Some namings corrected
- Routing list is sorted after change now
- Can be started without object
- needs release 3.20.x 2017-08-30 or earlier
|
|
1.5 | 2nd Aug 2017 |
| Martin Bartonitz | - The name 'period' changed to 'deadline' because this is the standard name for this purpose.
- Small look & feel changes for the whatabout field and the routinglist in the start form.
|
|
1.5 | 25th Jul 2017 |
| Martin Bartonitz | Internationalization: - Preset text for 'What about' and 'Comment'
- If 'What about' and 'Comment' are empty, some corresponding text
- Timestamp within 'What about'
- Some error cases handled in a better way
|
|
1.4 | 20th Jul 2017 |
| Martin Bartonitz | Start with basics: - Fill routing list during process start
- Optional monitoring and controlling task allows changes by the process initiator
- Sequential processing of the routing list with only one editor per task. If allowed by the process initiator, the current editor can change the rest tasks of the routing list
- Protocol of the processing comments.
|
|
...